120 lines
4.0 KiB
Markdown
120 lines
4.0 KiB
Markdown
|
|
# Executive Reconciliation Summary
|
||
|
|
|
||
|
|
**Generated:** 2026-03-30 14:58:37
|
||
|
|
**Scope:** 111 Placeholders
|
||
|
|
**Data Sources:** Export Catalog, Audit Reports (2026-03-29), Draft Document
|
||
|
|
|
||
|
|
## Overview
|
||
|
|
|
||
|
|
This reconciliation consolidates data from three authoritative sources to create a single source of truth for all 111 placeholders.
|
||
|
|
|
||
|
|
### Key Findings
|
||
|
|
|
||
|
|
- **71** placeholders (63%) are implemented in code
|
||
|
|
- **8** placeholders (7%) are fully compliant with normative requirements
|
||
|
|
- **22** placeholders (20%) are partially compliant
|
||
|
|
- **81** placeholders (73%) are non-compliant
|
||
|
|
|
||
|
|
### Reconciliation Results
|
||
|
|
|
||
|
|
- **Verified Match (7):** Draft, Export, and Audit align perfectly
|
||
|
|
- **Needs Sharpening (49):** Correct but incomplete metadata
|
||
|
|
- **Needs Refactor (16):** Code-docs conflicts exist
|
||
|
|
- **Draft Wrong (0):** Draft specification incorrect
|
||
|
|
- **New Required (39):** Not implemented, needs build
|
||
|
|
- **Unclear (0):** Manual review needed
|
||
|
|
|
||
|
|
### Priority Distribution
|
||
|
|
|
||
|
|
- **P0 (Critical):** 83 placeholders
|
||
|
|
- High usage (breaking change risk)
|
||
|
|
- Missing documentation (category/description)
|
||
|
|
- Unknown time window
|
||
|
|
- **P1 (High):** 10 placeholders
|
||
|
|
- Partially compliant with minor gaps
|
||
|
|
- **P2 (Medium):** 10 placeholders
|
||
|
|
- Non-compliant, needs work
|
||
|
|
- **P3 (Low):** 8 placeholders
|
||
|
|
- Compliant, maintenance only
|
||
|
|
|
||
|
|
## Critical Issues
|
||
|
|
|
||
|
|
### 1. Known Code-Documentation Conflicts
|
||
|
|
|
||
|
|
- **`weight_trend`**: Code uses 28d, docs say 7d/30d
|
||
|
|
- Resolution: Update docs to match code (28d)
|
||
|
|
- **`activity_summary`**: Code uses 14d, docs say 7d
|
||
|
|
- Resolution: Update docs to match code (14d)
|
||
|
|
- **`activity_detail`**: Time window unclear in code
|
||
|
|
- Resolution: Needs code review to determine actual time window
|
||
|
|
|
||
|
|
### 2. High-Usage Placeholders (Breaking Change Risk)
|
||
|
|
|
||
|
|
- **`name`** (19 uses, non_compliant)
|
||
|
|
- **`geschlecht`** (14 uses, non_compliant)
|
||
|
|
- **`height`** (12 uses, non_compliant)
|
||
|
|
- **`weight_aktuell`** (10 uses, compliant)
|
||
|
|
- **`weight_trend`** (10 uses, compliant)
|
||
|
|
- **`goal_bf_pct`** (10 uses, non_compliant)
|
||
|
|
- **`caliper_summary`** (8 uses, partially_compliant)
|
||
|
|
- **`circ_summary`** (8 uses, compliant)
|
||
|
|
- **`goal_weight`** (8 uses, non_compliant)
|
||
|
|
- **`protein_ziel_low`** (7 uses, non_compliant)
|
||
|
|
- **`protein_ziel_high`** (7 uses, non_compliant)
|
||
|
|
- **`activity_detail`** (4 uses, non_compliant)
|
||
|
|
|
||
|
|
### 3. Missing Documentation (P0)
|
||
|
|
|
||
|
|
**49** placeholders lack category classification
|
||
|
|
**49** placeholders lack descriptions
|
||
|
|
|
||
|
|
## Recommendations
|
||
|
|
|
||
|
|
### Immediate Actions (P0)
|
||
|
|
|
||
|
|
1. **Resolve Known Conflicts (3 placeholders, 2-4 hours)**
|
||
|
|
- Update documentation to match code implementation
|
||
|
|
- Validate time windows in code
|
||
|
|
|
||
|
|
2. **Classify Time Windows (74 placeholders, 8-12 hours)**
|
||
|
|
- Use name-based extraction for `*_7d`, `*_28d` patterns
|
||
|
|
- Extract from code default parameters
|
||
|
|
- Manual classification for unclear cases
|
||
|
|
|
||
|
|
3. **Add Categories and Descriptions (49 placeholders, 4-6 hours)**
|
||
|
|
- Bulk update from audit semantic analysis
|
||
|
|
- Use existing audit report classifications
|
||
|
|
|
||
|
|
### Next Sprint (P1)
|
||
|
|
|
||
|
|
1. **Add Confidence Logic (103 placeholders, 12-16 hours)**
|
||
|
|
- Implement for trend/delta placeholders
|
||
|
|
- Add min-data thresholds
|
||
|
|
|
||
|
|
2. **Document Data Layer Modules (100 placeholders, 6-8 hours)**
|
||
|
|
- Trace resolver functions to data layer
|
||
|
|
- Document source tables
|
||
|
|
|
||
|
|
### Later (P2-P3)
|
||
|
|
|
||
|
|
1. **Integrate Unused Placeholders (67 placeholders)**
|
||
|
|
- Create prompt use cases
|
||
|
|
- Plan integration timeline
|
||
|
|
|
||
|
|
2. **Achieve Production Status (30+ placeholders)**
|
||
|
|
- Reach 80%+ metadata completeness
|
||
|
|
- Complete all normative requirements
|
||
|
|
|
||
|
|
## Conclusion
|
||
|
|
|
||
|
|
The reconciliation process successfully analyzed all 111 placeholders.
|
||
|
|
While only 8 are currently fully compliant,
|
||
|
|
the systematic gaps are primarily documentation-related rather than functional.
|
||
|
|
With a structured remediation plan (estimated 82-110 hours), the system can reach
|
||
|
|
>60% normative conformity within 4-6 weeks.
|
||
|
|
|
||
|
|
**Next Steps:**
|
||
|
|
1. Review this summary with product/tech leads
|
||
|
|
2. Prioritize P0 items for immediate action
|
||
|
|
3. Begin systematic remediation following the implementation waves
|