52 lines
1.4 KiB
Markdown
52 lines
1.4 KiB
Markdown
|
|
# AP0.10d — MVP Validation
|
||
|
|
## Auftrag v0.1
|
||
|
|
|
||
|
|
**Status:** freigegeben
|
||
|
|
**Stand:** 2026-07-05
|
||
|
|
**Vorgänger:** AP1.0 ✓
|
||
|
|
**Gate für:** AP1.1+ (Methodenwahl), AP0.10c (UI)
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Ziel
|
||
|
|
|
||
|
|
Kairo mit **5 echten Vorhaben** prüfen — dokumentiert, nicht Bauchgefühl.
|
||
|
|
Output: ausgefüllter `Sprint0_AP0_10_Validation_Report_v0.1.md` + Go/No-Go.
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Testvorhaben
|
||
|
|
|
||
|
|
| # | Vorhaben | Typ (Vermutung) |
|
||
|
|
|---|----------|-----------------|
|
||
|
|
| 1 | Kairo Entwicklung | product_milestone_driven |
|
||
|
|
| 2 | Gewaltschutzkurs | program / content |
|
||
|
|
| 3 | Karate Training | routine / maturity |
|
||
|
|
| 4 | Familienorganisation | generic_operating |
|
||
|
|
| 5 | Server / Mindnet | routine_operations |
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Checkliste pro Vorhaben (~15 Min)
|
||
|
|
|
||
|
|
1. Vorhaben in Kairo anlegen (oder bestehendes nutzen)
|
||
|
|
2. Lifecycle-Badge prüfen (`/initiatives/{id}`)
|
||
|
|
3. Workspace: Nächste Aktion in **≤30s**?
|
||
|
|
4. Blocker früh sichtbar?
|
||
|
|
5. Meilenstein-Horizont hilfreich?
|
||
|
|
6. Backlog → Maßnahme sinnvoll?
|
||
|
|
7. Besser als Todo-Tool für *dieses* Vorhaben?
|
||
|
|
8. Welche **Methode** würde passen? (`generic_operating` / `product_milestone_driven` / …)
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
## Go-Kriterien (Recovery Plan §6)
|
||
|
|
|
||
|
|
- ≥3 von 5: „Hilft bei täglicher Steuerung“ = ja (schwach ja reicht nicht)
|
||
|
|
- Leitfrage auf Workspace ohne Schulung beantwortbar
|
||
|
|
- Report dokumentiert Lücken explizit
|
||
|
|
|
||
|
|
---
|
||
|
|
|
||
|
|
*Nutze `Sprint0_AP0_10_Validation_Report_v0.1.md` als Vorlage.*
|